Forest Holidays, Beddgelert

Forest Holidays, Beddgelert

Forest Holidays Instructed CDSI to produce doorsets for there newly opening Beddgelert site in Snowdonia. Consisting of 16 cabins located in a sheltered woodland glade, bordered by a tumbling river and situated in the heart of Snowdonia National Park sustainability and a natural feel was a key element in the CDSI scope – Croeso i Beddgelert Snowdonia!

This project consisted of 98 doorsets delivered over a 3 Month period. Deliveries to site were restricted in size due to the lack of storage space available. This presented CDSI with a logistical challenge ensuring control of unit cost uplifts across the project.

A product in keeping with the cabin internals resulted in CDSI producing 44mm Oak veneered door leaves set in a Solid Oak door frame with a solid oak architrave. The door, frames and door were all treated with a clear lacquer in order to increase durability and reduce discolourisation over time.

CDSI partnered the Oak veneer with a Satin Stainless Steel Ironmongery pack featuring a Zoo Hardware Curved Lever on Rose.

This project consisted of 98 doorsets delivered over a 3 Month period. Deliveries to site were restricted in size due to the lack of storage space available. This presented CDSI with a logistical challenge ensuring control of unit costs per doorset remained within budget.

“CDSI look forward to developing our partnership with Forest Holidays over the coming months and years, together we have developed a product offering that is fit for purpose and aesthetically suitable for the application requested. We couldn’t ask for a better customer”

Alistair Rosier Sales Director CDSI Oct 2018

Project Information
Snowdonia
Commercial
Snowdonia
2018
Let's talk
Need Help? Call Us Now
01293 787270
mask

Get In Touch for Expert Advice